EU Medical Device Regulation (MDR)
The framework governing medical devices placed on the European market, applicable since May 2021 and materially more demanding than the directive it replaced.
- Instrument
- Regulation (EU) 2017/745
- Authority
- Notified Bodies · European Commission · national competent authorities
What this market demands.
Regulation (EU) 2017/745 has applied since 26 May 2021, replacing the Medical Device Directive. It is not a re-labelling of the previous regime. The MDR raised the clinical evidence burden, up-classified a number of device types, extended obligations across the whole supply chain, and introduced continuous post-market obligations that persist for the life of the product.
The practical consequence for most manufacturers is that CE marking is no longer a project with an end date. It is a state that must be maintained, evidenced and periodically re-demonstrated.
Notified body capacity remains a genuine constraint on timelines. Manufacturers who treat conformity assessment as something to arrange once the technical file is complete frequently discover that the queue, not the documentation, is the critical path.
Where a device sits decides what it costs.
Classification is the single most consequential determination in the process, and the one most often inherited as an assumption instead of being established as a conclusion.
- Class I
- Lowest risk. Generally self-certified, except where the device is sterile, has a measuring function, or is a reusable surgical instrument. Each of those draws a notified body into the process.
- Class IIa
- Medium risk. Notified body involvement is required, with conformity assessment based on the quality system and an assessment of technical documentation on a sampling basis.
- Class IIb
- Higher risk. Notified body assessment of technical documentation is more extensive, and implantable Class IIb devices attract additional scrutiny.
- Class III
- Highest risk. Full technical documentation assessment, the heaviest clinical evidence expectations, and in defined cases a clinical evaluation consultation procedure.
The route to market, in order.
Steps can overlap, but they cannot meaningfully be reordered. Most delay comes from attempting one before the one before it is settled.
Determine classification
Apply the Annex VIII rules to the device's intended purpose. Classification drives every downstream cost, so an unexamined assumption here is the most expensive mistake available.
Establish the quality system
A quality management system meeting Article 10 obligations, in practice built to ISO 13485 and audited by the notified body.
Compile technical documentation
Annex II and Annex III documentation, including the clinical evaluation, risk management file, verification and validation, and the post-market surveillance plan.
Conformity assessment
Engage a notified body designated for the relevant device codes. For self-certified Class I devices this step does not apply.
Registration and UDI
Assign UDIs, register the device and the economic operators, and meet EUDAMED obligations as they come into force.
Post-market surveillance
Operate PMS, PMCF and vigilance. Periodic Safety Update Reports apply from Class IIa upward. This continues for as long as the device is on the market.
The calendar is part of the strategy.
Transitional deadlines have moved before and may move again. Treat these as orientation, not as a substitute for checking.
- 26 May 2021MDR became applicable, replacing the Medical Device Directive.
- 31 December 2027End of the extended transition for Class III and most implantable Class IIb legacy devices, subject to the conditions in Regulation (EU) 2023/607.
- 31 December 2028End of the extended transition for other Class IIb, Class IIa, and Class Is/Im devices, and certain up-classified Class I devices, again subject to conditions.
The failures we see most often.
None of these are exotic. They are ordinary decisions that were reasonable at the time and expensive in hindsight.
- Treating the MDD technical file as an MDR starting point instead of rebuilding to Annex II
- Underestimating notified body lead times and treating them as an administrative step
- A clinical evaluation that summarises literature without demonstrating equivalence or sufficiency
- Post-market surveillance written as a plan and never operated as a process
- Intended purpose drafted for marketing, then found to have widened the evidence burden
This page describes a public regulatory framework and was last reviewed 2026-08. It is provided for orientation and is not regulatory advice for a specific device. Requirements and deadlines change, so please confirm anything time-critical before relying on it.
Planning for European Union?
Tell us about the device, the class you believe it falls into, and any approvals you already hold elsewhere. We will tell you what we think the route really looks like.